[data-writing-block])>*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(–scroll-root-safe-area-inset-bottom,0px)+var(–thread-response-height))] scroll-mt-[calc(var(–header-height)+min(200px,max(70px,20svh)))]” dir=”auto” data-turn-id=”request-6a898485-653c-83ec-984e-31cbb66633e2-8″ data-turn-id-container=”request-6a898485-653c-83ec-984e-31cbb66633e2-8″ data-testid=”conversation-turn-12″ data-turn=”assistant”>
HAI DUONG VOLUNTEER WAREHOUSE 3 – 20,000 M² IN SIZE, ENHANCING COAL STORAGE AND DISTRIBUTION CAPACITY IN PHU THO
Located at Viet Tri Port in Thanh Mieu Ward, Phu Tho Province, Warehouse 3 of TNV Hai Duong is one of the key warehousing facilities in the company’s network of ports, warehouses, storage yards, and factories.
With a total area of approximately 20,000 m², Warehouse 3 is designed to support the receipt, consolidation, storage, and distribution of coal, thereby helping to expand TNV Hai Duong’s supply reach to industrial customers in the Phu Tho region and neighboring provinces.

20,000 m² in size – Distribution and storage center
With an area of 20,000 m², Warehouse 3 is capable of accommodating storage areas organized by coal type, a vehicle operation area, and an area for loading and unloading operations.
The construction of a warehouse in the Viet Tri area provides TNV Hai Duong with an additional storage facility within its supply chain network, thereby enhancing its ability to coordinate inventory based on specific regions and actual customer demand.
For manufacturing companies, having fuel reserves stored near consumption areas helps reduce transit time, increases operational flexibility, and supports more stable delivery schedules.
Securing a Steady Supply of Coal for Industrial Customers
Warehouse 3 is used to consolidate and manage anthracite, bituminous coal, and other common types of coal to meet production needs.
Once received, inventory will be stored according to plan, facilitating coordination and shipment to customers.
The Hai Duong Volunteer Group aims to maintain three key elements at Warehouse 3:
Stable Supply – Flexible Coordination – On-Time Delivery.
As a result, the company can be more proactive in fulfilling regular orders as well as meeting any unexpected demand for production volume.
A location well-suited for distribution operations

The establishment of Warehouse 3 at Viet Tri Port has enabled Hai Duong TNV to expand its warehouse network into the midland region and the north.
From this location, coal shipments can be received, stored, and then transported to power plants, manufacturing facilities, and industrial customers in many neighboring areas.
Warehouse 3, therefore, not only serves as a storage facility but also acts as a link between suppliers and the consumer market, helping TNV Hai Duong improve its distribution capabilities across the entire system.
Operational Support Equipment System
Operations at Warehouse 3 are supported by vehicles and equipment used for loading, unloading, consolidating, and transporting coal.
Excavators, transport vehicles, and other operational equipment are organized by process stage to ensure a continuous flow of goods and minimize wait times during warehouse inbound and outbound operations.
The basic operating procedures are organized in a sequence:
Receive inventory → Consolidate → Sort → Store → Dispatch → Ship.
Maintaining clear processes helps improve control over inventory and ensure on-time delivery.

Part of TNV Hai Duong’s system of 5 ports, warehouses, and yards
Warehouse 3 is a key component of TNV Hai Duong’s system of 5 ports, warehouses, yards, and factories in Hai Phong, Quang Ninh, and Phu Tho.
While Warehouses 1 and 2 serve as the foundation for large-scale storage and production in Hai Phong, Warehouse 3 helps the company expand its distribution reach and bring its products closer to consumer markets.
The connectivity between warehouse locations has enabled TNV Hai Duong to gradually build a supply chain that:
Supply → Warehouse → Inventory → Coordination → Shipping → Customer.
Enhancing the ability to serve the regional market

Maintaining Warehouse 3, with an area of 20,000 m², helps TNV Hai Duong increase its capacity to store and distribute coal within the system.
This serves as a foundation for the company to continue expanding its customer base, improve response times, and better meet the fuel needs of factories and manufacturing companies in the region.
TNV Hai Duong continues to strive toward the goal of building a stable, flexible supply chain capable of serving customers across a wide area.
We cordially invite our customers and partners to visit TNV Hai Duong Warehouse 3
TNV Hai Duong cordially invites our valued customers and partners to visit Warehouse 3 at Viet Tri Port in person to learn about the scale of our warehouse facilities, our inventory, and the company’s actual operational capabilities.
HAI DUONG
VOLUNTEER WAREHOUSE 3 📍 Viet Tri Port, Thanh Mieu Ward, Phu Tho
Province 📐 Size: 20,000 m²
☎️ Hotline: 092 688 3333 – 096 2211 555




