HAI DUONG VOLUNTEER WAREHOUSE 4 – 50,000 M² IN SIZE, ENHANCING COAL STORAGE AND DISTRIBUTION CAPACITY
Located in Thuy Minh, Bach Dang Ward, Hai Phong City, Warehouse 4 of Hai Duong TNV is one of the largest facilities in the company’s network of ports, warehouses, yards, and factories.
With a total area of approximately 50,000 m², Warehouse 4 is organized to support operations such as receiving, consolidation, storage, production, distribution, and shipping, thereby helping to enhance coal reserve capacity and increase flexibility in supply planning for power plants, manufacturing companies, and industrial customers.

50,000 m² – Expanding warehouse capacity
The 50,000 m² area allows the Hai Duong Volunteer Center to organize the space into several functional zones to support the various stages of its operations.
Areas for receiving goods, storing them by type, operating machinery, and coordinating vehicles are arranged to ensure a seamless flow between all stages, from the time coal is delivered to the warehouse until it is shipped out.
A large warehouse space also helps businesses be more proactive in maintaining inventory levels, especially during periods of high customer demand for fuel.
Securing a stable coal supply for production plans
For factories and industrial enterprises, a stable fuel supply is one of the key factors in maintaining continuous production.
With its capacity to consolidate and store inventory over a large area, Warehouse 4 helps TNV Hai Duong reduce its reliance on specific delivery schedules while proactively preparing coal supplies in accordance with customers’ delivery plans.
The product lines in the system include anthracite coal, bituminous coal, and other common types of coal, which serve a variety of production needs.
The Hai Duong Volunteers aim to uphold three core principles:
Proactive Supply Chain Management – Consistent Quality – On-Time Delivery.

Organizing production and ensuring coordinated coordination
Warehouse 4 not only serves as a storage facility but is also a key link in TNV Hai Duong’s production and supply chain.
Depending on the specific source of goods and customer requirements, warehouse operations are organized in a series of steps:
Receiving → Consolidation → Sorting → Screening/Blending → Storage → Distribution → Shipping.
Integrating production stages within a single system helps reduce internal lead times, improve space utilization, and enable businesses to respond more flexibly to changes in customer demand.
Machinery and equipment used in operations

Operations at Warehouse 4 are supported by a fleet of backhoe loaders, transport vehicles, production equipment, and related mechanical systems.
The machinery is arranged by operational area to facilitate the loading, unloading, movement, consolidation, and preparation of goods.
The coordination among equipment, vehicles, and the operations team enables Warehouse 4 to maintain a steady production pace while improving its ability to handle delivery schedules involving large volumes.
The Advantage of Connectivity in the Hai Duong Volunteer System
Warehouse 4 in Hai Phong is part of the network of five ports, warehouses, yards, and factories that TNV Hai Duong is developing.
Having multiple warehouse locations in Hai Phong, Quang Ninh, and Phu Tho gives businesses more options for selecting consolidation points and coordinating inventory based on customer locations, production schedules, and transportation needs.
Within that system, Warehouse 4, with an area of 50,000 m², contributes to:
- Increase coal storage capacity.
- Supports the processing of shipment plans for high-volume goods.
- Proactively allocate inventory among warehouse locations.
- Increase production capacity and prepare inventory.
- Reduce the time it takes to coordinate with customers.
- Helps ensure a stable fuel supply for industrial production.
A link in the closed-loop supply chain
TNV Hai Duong is gradually building a supply chain with seamless connectivity:
Coal source → Port – Warehouse – Storage yard → Production → Stockpile → Transportation → Customer’s plant.
With a floor area of 50,000 m², Warehouse 4 plays a crucial role in increasing storage capacity and providing additional room for production and the distribution of goods.
This also serves as the foundation for Hai Duong Volunteers to continue improving their ability to serve customers who have a regular need for coal and high expectations regarding delivery schedules.

Supporting our customers’ production operations
In addition to expanding the size of its warehouses, TNV Hai Duong focuses on organizing inventory based on actual demand.
The goal is not only to have a supply of coal in stock, but also to ensure that the supply can be prepared, produced, and distributed at the right time when customers need it.
Through its large-scale warehouse system, TNV Hai Duong aims to build a supply chain platform with sufficient capacity to support the long-term production plans of industrial enterprises.
We cordially invite our customers and partners to visit TNV Hai Duong Warehouse 4
TNV Hai Duong cordially invites our valued customers and partners to visit Warehouse 4 in Thuy Minh – Bach Dang, Hai Phong, to see firsthand the scale of our warehouse facilities, our machinery, our inventory, and our production operations.