HAI DUONG VOLUNTEER WAREHOUSE 1 – 60,000 M² IN SIZE, A FOUNDATION FOR COAL STORAGE AND SUPPLY CAPACITY
Located in the Chau Xa Residential Area, Nhi Chieu Ward, Hai Phong City, TNV Hai Duong Warehouse 1 is one of the key links in the company’s port-warehouse-yard-factory system.
With a total area of approximately 60,000 m², Warehouse 1 is organized to provide integrated support for the activities of receiving, consolidating, storing, sorting, blending, and shipping coal, thereby helping to enhance the ability to secure a stable coal supply and meet the regular supply needs of power plants and industrial customers.

60,000 m² – Ample space for warehousing and manufacturing operations
The 60,000 m² site allows TNV Hai Duong to organize multiple functional areas within a single system, including a raw material staging area, a storage area organized by type, a screening and blending area, a machinery operation area, and a shipping area.
The spacious warehouse area also facilitates the coordination of vehicles, excavators, transport trucks, and production equipment, thereby improving operational efficiency and reducing the time it takes to move goods within the warehouse.
In the industrial coal supply sector, the scale of a warehouse and storage yard is not only reflected in its size but, more importantly, in its ability to maintain inventory levels, organize supply sources flexibly, and be ready to fulfill orders in accordance with customers’ production schedules.

Proactively stockpile a wide variety of coal
Warehouse 1 is a facility dedicated to the storage and production of anthracite, bituminous coal, and other common types of coal in accordance with market demand.
After being received, the materials can be sorted by type and intended use, facilitating quality control, screening, and blending.
Maintaining inventory at the warehouse helps TNV Hai Duong reduce its reliance on specific ship arrival times, while also increasing its ability to respond proactively when customers have additional needs or request large-volume deliveries.
This is one of the key factors helping the Hai Duong Volunteers move toward their goal:
Proactive Supply Chain Management – Consistent Quality – Guaranteed Delivery Timelines.

Machinery systems for production and operations

At Warehouse 1, production operations are supported by equipment and machinery used for loading, unloading, moving, consolidating, and processing goods.
Equipment such as backhoe loaders, transport vehicles, screening systems, and mechanical equipment supporting production is arranged appropriately for each operational area.
The process, from receiving raw materials to shipping the finished goods, is organized into individual stages:
Receive coal → Consolidate → Sort → Screen → Blend → Store → Ship.
Organizing the process in a chain helps increase flexibility in production, while also enabling coal to be prepared in a way that better meets the actual usage requirements of each customer.
A platform for processing industrial orders

For cement plants, boiler plants, and industrial customers, the stability of the fuel supply has a direct impact on production schedules.
Therefore, in addition to product quality, TNV Hai Duong places special emphasis on inventory management and on-time delivery.
With an area of 60,000 m², Warehouse 1 serves as one of the key storage and distribution centers, helping the company:
- Maintain coal reserves in accordance with the plan.
- Classify inventory by type.
- Proactively organize screening and blending.
- Flexibly coordinate the dispatch of outbound shipments.
- Handle multiple delivery schedules simultaneously.
- Ready to meet customers’ high-volume needs.
A link in TNV Hai Duong’s system of 5 ports, warehouses, and yards
Warehouse 1 does not operate independently but is part of TNV Hai Duong’s system of five ports, warehouses, yards, and factories in Hai Phong, Quang Ninh, and Phu Tho.
The network connecting its warehouses enables TNV Hai Duong to enhance its ability to organize inventory, maintain stockpiles, and coordinate product distribution by region.
Among them, Warehouse 1, with an area of 60,000 m², is one of the facilities that plays a key role in the production, storage, and distribution operations of the entire system.
Step-by-Step Improvement of Coal Supply Capacity
TNV Hai Duong continues to invest in, reorganize its production facilities, and improve operational efficiency at its warehouse network to better meet customer needs.
Warehouse 1 is not just a coal storage facility; it is intended to become part of a closed-loop supply chain from:
Sourcing – Transportation – Warehousing – Manufacturing – Delivery.
Through this, TNV Hai Duong aims to build a stable and flexible supply platform capable of meeting the long-term production plans of industrial enterprises.
We cordially invite our customers and partners to visit Warehouse 1 of TNV Hai Duong
TNV Hai Duong cordially invites our valued customers and partners to visit Warehouse 1 in Chau Xa – Nhi Chieu, Hai Phong, to see firsthand the scale of our warehouse facilities, our machinery, our production operations, and the coal currently stored there.
By touring the facility in person, customers can gain a clearer understanding of TNV Hai Duong’s storage capacity, production organization, and supply capabilities.
HAI DUONG
VOLUNTEER WAREHOUSE 1 📍 Chau Xa Residential Area, Nhi Chieu Ward, Hai Phong City
📍 Map location: https://maps.app.goo.gl/561ojSJiU7BaSN4g6
📐 Size: 60,000 m²
☎️ Hotline: 092 688 3333 – 096 2211 555