Located in the Bãi Sải area, Kinh Môn Ward, Hải Phòng City, Warehouse 2 of TNV Hải Dương is one of the company’s key facilities within its network of ports, warehouses, yards, and factories.

With a total area of approximately 55,000 m², Warehouse 2 is designed to support operations such as receiving, consolidating, storing, sorting, blending, and shipping goods, thereby helping to increase storage capacity and ensure a reliable supply of coal to power plants, manufacturing companies, and industrial customers.

   

55,000 m² – Centralized production facility

The 55,000 m² facility allows TNV Hai Duong to organize functional areas according to each production stage and each product category.

The warehouse is organized into zones for raw material consolidation, sorting, storage, screening, blending, and vehicle coordination, which helps ensure that the internal movement of coal within the warehouse is carried out more smoothly and efficiently.

The large floor space also enables machinery, transportation vehicles, and production support systems to operate in sync, helping to boost productivity and ensure the ability to meet delivery schedules for large-volume orders.

Screening and blending according to production needs

One of the key functions at Warehouse 2 is to sort and prepare coal that meets the specific needs of each customer.

After being received and consolidated, coal can be sorted by type, size, and intended use before proceeding to the next stages of processing.

The production process is organized in a chain:

Receiving → Consolidation → Sorting → Screening → Blending → Storage → Shipping.

Taking the initiative in these processes allows Hai Duong Volunteers to be more flexible in preparing inventory according to each production plan, rather than simply performing basic warehousing functions.

Secure a stable supply of goods and increase inventory capacity

For businesses that use coal in their production, the ability to maintain a stable fuel supply is a key factor in minimizing the risk of production line disruptions.

With an area of 55,000 m², Warehouse 2 helps increase storage capacity and inventory reserves within the TNV Hai Duong system.

Coal supplies are organized into appropriate zones, facilitating management, coordination, and preparation of shipments before delivery to customers.

Through this, the Hai Duong Volunteers aim to uphold three core principles:

Proactive Supply Chain Management – Flexible Production – Guaranteed Delivery Schedules.

Machinery system for warehouse operations

Operations at Warehouse 2 are supported by production-related vehicles and machinery, such as backhoe loaders, transport vehicles, mechanical equipment, and coal screening systems.

The combination of a spacious warehouse floor plan and an operational equipment system enables all stages—from the collection and transport of raw materials to the preparation of goods—to be carried out continuously and according to schedule.

The operations, mechanical, and related teams work together to maintain stable production, ensure safety, and meet schedule requirements.

Connecting suppliers with the needs of manufacturing companies

Warehouse 2 is not only a storage facility but also serves as a link between the coal supply and customers’ actual demand.

From here, inventory can be organized, produced, and coordinated to serve customer groups such as:

  • Cement plant.
  • Businesses that use industrial boilers.
  • Manufacturing facilities have a regular need for coal.
  • Customers are looking for anthracite, bituminous, and other common types of coal.
  • Orders must be screened and blended as required.

The ability to flexibly manage inventory allows TNV Hai Duong to be more proactive in responding to changes in production volume and customer delivery schedules.

A key link in the 5-port-warehouse-yard system

Warehouse 2 is part of the system of five ports, warehouses, yards, and TNV Hai Duong factories located in Hai Phong, Quang Ninh, and Phu Tho.

The connections between facilities help businesses gradually build a supply chain starting from:

Import and Receipt of Goods → Port – Warehouse – Yard → Production → Storage → Transportation → Customers.

Within this system, Warehouse 2, with an area of 55,000 m², helps increase TNV Hai Duong’s capacity for production, storage, and distribution of coal in the northern region.

Continue to improve production and supply capabilities

TNV Hai Duong continues to invest in its warehouse and yard facilities, machinery, and operational organization in order to gradually enhance its ability to serve customers.

The development of facilities spanning tens of thousands of square meters enables businesses to be more proactive in managing their inventory, increase their storage capacity, and lay the groundwork for long-term supply plans.

The Hai Duong Volunteer Warehouse No. 2 is part of that strategy—aimed at building a stable, flexible coal supply system capable of meeting large-scale production needs.

We cordially invite our customers and partners to visit TNV Hai Duong Warehouse 2

TNV Hai Duong cordially invites our valued customers and partners to visit Warehouse 2 in person to explore the facility’s layout, observe our sorting and production operations, examine our machinery, and view our actual inventory on-site.